Ticket No.: | 864:62 |
Subject: | TransPAC2 TOKY-TransPAC2 LOSA Backbone Circuit Outage Resolved |
Affected: | TransPAC2 TOKY-TransPAC2 LOSA Backbone Circuit Peer APAN |
Start Time: | Friday, October 17, 2008, 3:12 PM (1512) UTC |
End Time: | Saturday, October 18, 2008, 4:02 AM (0402) UTC |
Description: | TransPAC2 TOKY-TransPAC2 LOSA Backbone Circuit was
unavailable. KDDI Engineers reported that
this outage was caused by a fiber cut between Los
Angeles, CA and Hillsboro, Oregon. The fiber has
been repaired and the service restored. |
|
Ticket No.: | 862:62 |
Subject: | TransPAC2 Core Node LOSA Maintenance Completed |
Affected: | TransPAC2 TOKY-TransPAC2 LOSA |
Start Time: | Thursday, October 16, 2008, 12:07 PM (1207) UTC |
End Time: | Thursday, October 16, 2008, 12:37 PM (1237) UTC |
Description: | TransPAC2 Engineers worked with APAN Engineers to
perform a software maintenance on the TransPAC2 core
nodes in Los Angeles and Tokyo. During this time, the
TransPAC2 TOKY-TransPAC2 LOSA backbone circuit was
unavailable. Maintenance has been completed. |
| |