TransPAC2 Network Operations Report
07/26/2010 - 08/01/2010

TransPAC2 Network Operations Center
at Indiana University

New Connections

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)


None during this report period

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

1094 3-Elevated 2-High TransPAC2 TOKY-TransPAC2 LOSA Backbone Circuit Maintenance Completed Hardware 07/27/2010 3:01 AM 07/27/2010 3:12 AM
1095 4-Normal 3-Elevated TransPAC2 Peer APAN via JGN2 Maintenance Completed Circuit 07/30/2010 5:14 PM 07/30/2010 5:23 PM

Scheduled Maintenances Detail

Ticket No.:1094:62
Subject:TransPAC2 TOKY-TransPAC2 LOSA Backbone Circuit Maintenance Completed
Affected:TransPAC2 TOKY-TransPAC2 LOSA
Start Time:Tuesday, July 27, 2010, 3:01 AM (0301) UTC
End Time:Tuesday, July 27, 2010, 3:12 AM (0312) UTC
Description: TOKY-TransPAC2 LOSA Backbone circuit was briefly unavailable while APAN Engineers performed a hardware maintenance. Maintenance has been completed.

Ticket No.:1095:62
Subject:TransPAC2 Peer APAN via JGN2 Maintenance Completed
Affected:Peer APAN* via JGN2
Start Time:Friday, July 30, 2010, 5:14 PM (1714) UTC
End Time:Friday, July 30, 2010, 5:23 PM (1723) UTC
Description: Peer APAN via JGN2 is now available. JGN2 engineers performed maintenance work between Los Angeles and Tokyo. The maintenance has been completed. *Peer APAN is multihomed and therefore remained reachable.


Downtime and Availability



TransPAC2 Core NodesDown TimeReporting Period Availability52 Week Availability
TransPAC2 T320 - LA0 hr 0 min100.00000%99.99943%
6410 Ethernet Switch0 hr 0 min100.00000%99.95921%
3410 Ethernet Switch0 hr 0 min100.00000%100.00000%
OOB Router0 hr 0 min100.00000%100.00000%

Aggregate TransPAC2 Core Nodes0 hr 0 min100.00000%99.98966%

TransPAC2 Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
TransPAC2 LOSA-JGN2 LOSA 10GigE0 hr 9 min99.91071%99.99829%
TransPAC2 LOSA-Pacific Wave LOSA 10GigE0 hr 0 min100.00000%100.00000%
TransPAC2 TOKY-TransPAC2 LOSA0 hr 11 min99.89087%99.57593%

Aggregate All TransPAC2 Backbone Circuits0 hr 20 min99.93386%99.85807%





Upcoming Scheduled Maintenances

Ticket No.:1096:62
Subject:TransPAC2 Peer APAN via JGN2 Maintenance
Affected:Peer APAN* via JGN2
Start Time:Thursday, August 5, 2010, 2:00 AM (0200) UTC
End Time:Thursday, August 5, 2010, 5:00 AM (0500) UTC
Description: Peer APAN via JGN2 will be unavailable while JGN2 performs maintenance on their backbone switches. An outage of 1 minute is expected, however the entire maintenance window has been reserved. *Peer APAN is multihomed and therefore will remain reachable.