WIX ANA Network Operations Report
11/02/2015 - 11/08/2015

WIX ANA Network Operations Center
at Indiana University

New Connections

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Source Of Impact Start Time (UTC) End Time (UTC)

5582-High 2-High Brief Outage Resolved - WIX ANA (London) Unannounced MaintenanceVendor 11/03/2015 5:26 PM 11/03/2015 5:32 PM

Unscheduled Outages Detail


Ticket No.:558:130
Subject:Brief Outage Resolved - WIX ANA (London)
Source Of Impact:Vendor
Affected:Trans-Atlantic ANA-100 WIX-London
Start Time:Tuesday, November 3, 2015, 5:26 PM (1726) UTC
End Time:Tuesday, November 3, 2015, 5:32 PM (1732) UTC
Description:The above ANA-100 circuit was briefly unavailable. The vendor was contacted and determined that the reason for the outage was scheduled maintenance to upgrade software on their router in London. Should your path have a backup provisioned over the ANA-100 MAN LAN-Amsterdam path, your traffic should have redirected.

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Source Of Impact Start Time (UTC) End Time (UTC)

None during this report period

Downtime and Availability



WIX ANA Core NodesDown TimeReporting Period Availability52 Week Availability
sw.net.wix.internet2.edu0 hr 0 min100.00000%100.00000%

Aggregate WIX ANA Core Nodes0 hr 0 min100.00000%100.00000%

WIX ANA Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
WIX-LOND-WASH2-100GE-015300 hr 6 min99.94048%99.55392%

Aggregate All WIX ANA Backbone Circuits0 hr 6 min99.94048%99.55392%




Upcoming Scheduled Maintenances

Ticket No.:564:130
Subject:Maintenance 1 of 2 - WIX ANA (London)
Affected:WIX ANA 100G
Start Time:Friday, November 13, 2015, 4:01 AM (0401) UTC
End Time:Friday, November 13, 2015, 10:01 AM (1001) UTC
Description: The above listed circuit will be unavailable while TATA Engineers perform maintenance to repair a damaged optical fiber cable. An outage is expected. The entire window is reserved. This is maintenance 1 of 2.

Ticket No.:565:130
Subject:Maintenance 2 of 2 - WIX ANA (London)
Affected:WIX ANA 100G
Start Time:Saturday, November 14, 2015, 4:00 AM (0400) UTC
End Time:Saturday, November 14, 2015, 10:00 AM (1000) UTC
Description: The above listed circuit will be unavailable while TATA Engineers perform maintenance to repair a damaged optical fiber cable. An outage is expected. The entire window is reserved. This is maintenance 2 of 2.