Internet2 IP Network Operations Report
06/20/2011 - 06/26/2011

Internet2 IP Network Operations Center
at Indiana University

New Connections

None


Upgrades

None


New Services

None


Unscheduled Outages Summary

Ticket Number Customer Impact Network Impact Title Outage Type Start Time (UTC) End Time (UTC)

175002-High 2-High Internet2 IP Network Backbone Circuits NEWY-WASH Stability Circuit - Damaged Fiber 06/22/2011 11:37 PM 06/23/2011 5:52 AM
06/24/2011 3:19 AM 06/24/2011 3:20 AM
175102-High 2-High Internet2 IP Network Backbone Circuits CHIC-KANS Outage Resolved Circuit - Damaged Fiber 06/24/2011 4:30 PM 06/24/2011 4:39 PM
06/24/2011 10:24 PM 06/24/2011 10:54 PM
06/24/2011 11:09 PM 06/24/2011 11:12 PM

Unscheduled Outages Detail


Ticket No.:17500:45
Subject:Internet2 IP Network Backbone Circuits NEWY-WASH Stability
Affected:Backbone Circuits NEWY-WASH
Connector MAX (NEWY)*
Connector Drexel
Connector MAGPI (WASH)
Start Time:Wednesday, June 22, 2011, 11:37 PM (2337) UTC
End Time:Thursday, June 23, 2011, 5:52 AM (0552) UTC
Start Time:Friday, June 24, 2011, 3:19 AM (0319) UTC
End Time:Friday, June 24, 2011, 3:20 AM (0320) UTC
Description:Backbone Circuits NEWY-WASH is currently stable. Level(3) Communications reports the outage was due to damaged fiber in Philadelphia, PA. The fiber damage was more extensive than originally determined and will require additional time and resources to repair permanently. A new maintenance window will be announced once it becomes available.

Ticket No.:17510:45
Subject:Internet2 IP Network Backbone Circuits CHIC-KANS Outage Resolved
Affected:Backbone Circuit CHIC-KANS
ION Backbone Circuit CHIC-KANS
Start Time:Friday, June 24, 2011, 4:30 PM (1630) UTC
End Time:Friday, June 24, 2011, 4:39 PM (1639) UTC
Start Time:Friday, June 24, 2011, 10:24 PM (2224) UTC
End Time:Friday, June 24, 2011, 10:54 PM (2254) UTC
Start Time:Friday, June 24, 2011, 11:09 PM (2309) UTC
End Time:Friday, June 24, 2011, 11:12 PM (2312) UTC
Description:The above listed circuits are available. Level(3) Communications technicians have installed temporary fiber between Centerview and Kansas City, MO. All services have been restored and are expected to remain stable. A maintenance will be announced at a later date to move back to the original fiber.

Scheduled Maintenances Summary

Ticket Number Customer Impact Network Impact Title Maintenance Type Start Time (UTC) End Time (UTC)

None during this report period

Downtime and Availability



Internet2 IP Core NodesDown TimeReporting Period Availability52 Week Availability
CHIC T16000 hr 0 min100.00000%99.89849%
NEWY T16000 hr 0 min100.00000%99.97666%
SEAT MX9600 hr 0 min100.00000%99.99981%
WASH T16000 hr 0 min100.00000%99.95105%
HOUS MX9600 hr 0 min100.00000%99.99943%
LOSA T16000 hr 0 min100.00000%99.97533%
ATLA T16000 hr 0 min100.00000%99.98691%
SALT T16000 hr 0 min100.00000%99.97476%
KANS T16000 hr 0 min100.00000%99.96015%

Aggregate Internet2 IP Core Nodes0 hr 0 min100.00000%99.96918%

** Less than 52 weeks of data available

Internet2 IP Backbone CircuitsDown TimeReporting Period Availability52 Week Availability
I2-HOUS-LOSA-10GE-055590 hr 0 min100.00000%99.99412%
I2-ATLA-CHIC-10GE-054190 hr 0 min100.00000%99.76871%
** I2-HOUS-KANS-10GE-055600 hr 0 min100.00000%99.80476%
I2-CHIC-NEWY32AOA-10GE-052390 hr 0 min100.00000%99.89204%
** I2-CHIC-NEWY32AOA-10GE-056670 hr 0 min100.00000%99.89204%
I2-NEWY32AOA-WASH-10GE-052426 hr 16 min96.26984%99.81235%
I2-CHIC-WASH-10GE-052500 hr 0 min100.00000%99.92088%
** I2-HOUS-KANS-10GE-055610 hr 0 min100.00000%99.80533%
** I2-NEWY32AOA-WASH-10GE-046436 hr 16 min96.26984%99.81273%
I2-ATLA-WASH-10GE-052510 hr 0 min100.00000%99.89697%
I2-ATLA-WASH-10GE-051330 hr 0 min100.00000%99.89944%
I2-ATLA-HOUS-10GE-054230 hr 0 min100.00000%99.92372%
** I2-ATLA-HOUS-10GE-055620 hr 0 min100.00000%99.92372%
** I2-KANS-SALT-10GE-055660 hr 0 min100.00000%99.94517%
I2-KANS-SALT-10GE-051380 hr 0 min100.00000%99.94517%
** I2-SALT-SEAT-10GE-055650 hr 0 min100.00000%99.95560%
** I2-SALT-SEAT-10GE-055730 hr 0 min100.00000%99.95560%
** I2-LOSA-SALT-10GE-055710 hr 0 min100.00000%99.95978%
** I2-LOSA-SALT-10GE-055630 hr 0 min100.00000%99.95978%
I2-ATLA-CHIC-10GE-056380 hr 0 min100.00000%99.77004%
I2-CHIC-KANS-10GE-055670 hr 42 min99.58333%99.82202%
I2-CHIC-KANS-10GE-055680 hr 42 min99.58333%99.81956%
I2-CHIC-KANS-10GE-059760 hr 42 min99.58333%99.89223%
I2-CHIC-WASH-10GE-056370 hr 0 min100.00000%99.98520%
I2-LOSA-SEAT-10GE-055640 hr 0 min100.00000%99.98103%
I2-LOSA-SEAT-10GE-055720 hr 0 min100.00000%99.98103%
I2-HOUS-LOSA-10GE-055810 hr 0 min100.00000%99.99412%

Aggregate All Internet2 IP Backbone Circuits14 hr 38 min99.67740%99.90049%





Upcoming Scheduled Maintenances

Ticket No.:17513:45
Subject:Internet2 IP Network Core Node WASH Maintenance
Affected:Core Node WASH
Start Time:Tuesday, June 28, 2011, 3:00 AM (0300) UTC
End Time:Tuesday, June 28, 2011, 6:00 AM (0600) UTC
Description: Internet2 Engineers will be performing maintenance on Core Node WASH to replace a failing routing engine. No impact to service is expected as the backup routing engine will be in use; however the entire maintenance window has been reserved.

Ticket No.:17519:45
Subject:Internet2 IP Network Backbone Circuit HOUS-LOSA Maintenance
Affected:Backbone Circuit HOUS-LOSA
Start Time:Thursday, June 30, 2011, 5:00 AM (0500) UTC
End Time:Thursday, June 30, 2011, 7:00 AM (0700) UTC
Description: Backbone Circuit HOUS-LOSA will be unavailable while Level(3) Communications perform a hardware replacement in Deming, NM. An outage of 30 minutes is expected; however the entire window is reserved. Traffic will reroute during this maintenance.